The current position:Home > Products > Laboratory electric furnace > GSX Series of energy-efficient high-temperature sintering electric furnace

Click to enlarge

GSX Series of energy-efficient high-temperature sintering electric furnace

RELATED ARTICLES
Introduction

 
 
               
 
Applicable to laboratory and industrial inorganic materials sintered in the furnace, especially for zirconia, alumina, industrial production, the use of new materials and new design, the energy saving effect creating a new energy-saving electric furnace milestone.
     , The furnace power consumption is 25-30%, greatly saves energy and reduces the cost of the ordinary electric furnace.
     Second, shorten the production cycle. The electric furnace to save 50% and shorten the production cycle of the cooling time
     , Furnace uniformity product appearance
     Fourth, lift smooth, easy loading and unloading products.
 
型  號(hào) 規(guī) 格
爐膛尺寸
長(zhǎng)/寬/高mm
額定燒結(jié)溫度
功     率
kw
控制方式
GSX-1-13,16
300/300/300
1350,1650
12,15
32段程控
GSX-2-13,16
400/400/400
1350,1650
18,25
32段程控
GSX-3-13,16
600/600/600
1350,1650
30,40
32段程控
GSX-4-13,16
800/800/800
1350,1650
40, 60
32段程控
 可定制各類尺寸、溫度的非標(biāo)電爐
 
 
 
 
     
Example:
 
  
      I should Zhuzhou requirements of a company (production of zirconia, alumina, industrial supplies), 400/350/600 electric furnace production in 2005, and for small batch firing achieve good energy saving effect and shorten the production cycle basis on the design and manufacture. Its energy-saving effect creating a new energy-saving electric furnace milestone.
     The lift furnace design effective volume 600/600/600mm, 1650 ℃, ordinary electric furnace of the same specifications produced by a company of Yixing:
     An ordinary electric furnace to complete sintering (40 hours) to about 1000 degrees power, the new furnace When sintering was complete (40 hours) of about 230 degrees of power, savings of 770 degrees. Significantly save energy and reduce costs.
     Second, shorten the production cycle. Ordinary electric furnace to complete cooling takes about 3-4 days, new electric furnace to complete the cooling time is about 1-2 days. Two days, saving time and shorten the production cycle
    Third, the furnace temperature uniformity and appearance of the product after sintering
    Fourth, lift smooth, easy loading and unloading products. 
 
 
 
 

 

 

 

 
 
 
 
 


 
 
點(diǎn)擊次數(shù):897

 

Order

留言框

  • Theme:

  • Content:

  • Commpany:

  • Name:

  • Telephone:

  • Email:

  • Address:

  • Province:

  • Verification Code:

Contact

Email:130732189@qq.com
Address:Add:No.168 Xiaotang east road,German Industrial Park,Xiangtan City,Hunan,China
WeChat scan focuses on us:
Service Contact Code

Hotline

86+0731-58534888,86+13607322318